Previous Picture

Back to Gallery

Next Picture

 

Past the shops

 

 

 

The grain train (plus one Katalistiks car? How did that get in there?) is seen going through New Previa via the wye from the south. At this point the train was already more than 140 cars long, and needed 4 engines.

Picture taken 7/15/2001

 

Previous Picture

Back to Gallery

Next Picture